|
Question: How often should critical and regular test sites be swabbed?
Answer:
Critical test sites should be swabbed on a daily basis or anytime prior to start-up. If a failure is generated immediate corrective action should be taken and the area re-swabbed until a passing result can be obtained. Corrective action steps may include and additional water rinsing of the entire area or a complete re-cleaning if necessary.
|